Our WGS Electrical team worked alongside our longstanding client Kiddie of Southport to help deliver a brand new Boots Opticians – situated in a prime location on the High Street in Sheffield.

We commenced our works by stripping out the existing electrical infrastructure (lighting, distribution boards, associated HVAC controls, and wiring). After installing a 10 KVA 110V site power system, we installed a temporary site lighting and power system.

Electrical fit-out works then comprised a new distribution board, including new split-sub metered Schneider boards, containment system, (incorporating trays and baskets for power, fire alarm, and data cabling), as well as a Busbar tap-off system for general power and lighting circuits. Brand new lighting, consisting of track and spot LED lights with dimmable LED panel lights in the consulting rooms. New power supplies for the HVAC system, new wall-mounted comms cabinet, field wiring, and termination of Cat5E data cabling. A fire alarm system was installed to strict L1 design specifications.

Despite an initial 3-day delay to the programme due to lease complications, the store was delivered within the original 5-week programme.

 

                     

Close Menu

W G Silverton & Co Ltd

Silverton Mews
Meeting House Lane
Baldock
Hertfordshire, SG7 5BP

T: 01462 491800
E: ask.us@silvertons.co.uk