Retail Fit-out

๐๐๐จ๐ฉ๐ ๐จ๐ ๐๐จ๐ซ๐ค๐ฌ
The works comprised the complete refurbishment of the ground floor beauty hall, including installation of a new suspended ceiling with integrated LED lighting, upgraded air-conditioning, enhanced electrical infrastructure, CCTV and access control systems, structural alterations, decorative wall finishes, digital media installations, shopfront improvements and the installation of new beauty retail displays. Existing terrazzo flooring was retained, repaired and restored as part of the scheme.
๐๐๐ฒ ๐
๐๐๐ญ๐ฎ๐ซ๐๐ฌ
โข Refurbishment within a live flagship retail environment.
โข New ceiling, lighting and air-conditioning systems.
โข Structural alterations to meet crowd-loading requirements.
โข Integrated digital media, customer experience and security systems.
โข Shopfront enhancements and high-quality retail fit-out.
โข Restoration of existing terrazzo flooring.
๐๐ก๐๐ฅ๐ฅ๐๐ง๐ ๐๐ฌ
Working within one of London's busiest retail destinations required meticulous planning to maintain uninterrupted trading while managing deliveries, waste removal and construction logistics. Close collaboration with Boots UK, the project team and neighbouring stakeholders ensured disruption was minimised throughout the programme.
๐๐ซ๐จ๐ ๐ซ๐๐ฆ๐ฆ๐
The refurbishment was successfully completed over a 16-week programme, marking the first milestone in the wider phased redevelopment of the Oxford Street flagship store.
๐๐ฎ๐ญ๐๐จ๐ฆ๐
The completed beauty hall delivers a contemporary, customer-focused retail environment that reflects the Boots UK brand while providing a strong foundation for the subsequent phases of the redevelopment. The project was delivered safely, on programme and received excellent feedback from the store management team for the professionalism and commitment demonstrated throughout.
๐๐จ๐ฆ๐ฉ๐ฅ๐๐ญ๐ข๐จ๐ง: December 2025
๐๐ซ๐จ๐ ๐ซ๐๐ฆ๐ฆ๐: 16 weeks

๐๐๐จ๐ฉ๐ ๐จ๐ ๐๐จ๐ซ๐ค๐ฌ
The project commenced with the complete strip-out of the existing opticians, including the removal of internal partitions, ceilings, floor finishes, fixtures, fittings and redundant mechanical and electrical services.
The fit-out included the construction of new consulting rooms and Boots UK healthcare rooms, refurbishment of existing consultation rooms and pre-screen areas, upgrades to the sales floor and back-of-house accommodation, together with new finishes, furniture, signage and branded graphics. New mechanical and electrical services were installed throughout to support the revised layout and operational requirements.
๐๐๐ฒ ๐
๐๐๐ญ๐ฎ๐ซ๐๐ฌ
โข Introduction of the latest Boots Opticians concept design within consulting and clinical rooms
โข New furniture, wall finishes, and floor finishes across upgraded areas
โข Refreshed sales floor incorporating current model specification fixtures, fittings, and furniture
โข New signage and wall graphics to reinforce brand identity and enhance the customer experience
โข Mechanical and electrical services installed to support the new layout
๐๐ก๐๐ฅ๐ฅ๐๐ง๐ ๐๐ฌ
The works were delivered within a live first-floor retail environment on one of London's busiest shopping streets. Careful planning and coordination were required to manage deliveries, site logistics and construction activities while maintaining safe access and minimising disruption to the operational Boots store and its customers.
๐๐ฎ๐ญ๐๐จ๐ฆ๐
The completed scheme provides Boots with a modernised opticians environment that improves clinical functionality and delivers an enhanced customer journey, fully aligned with the brandโs latest design and operational standards.
๐๐จ๐ฆ๐ฉ๐ฅ๐๐ญ๐ข๐จ๐ง: December 2025
๐๐ซ๐จ๐ ๐ซ๐๐ฆ๐ฆ๐: 8 weeks

๐๐๐ฒ ๐๐ก๐๐ฅ๐ฅ๐๐ง๐ ๐๐ฌ
โข Maintaining uninterrupted trading in a live retail environment
โข Structural and services separation between floors
โข Complex M&E, fire, and life-safety compliance requirements
โข Mid-programme expansion of scope and programme duration
๐๐๐๐๐ ๐๐
๐๐๐๐
๐๐ญ๐ซ๐ฎ๐๐ญ๐ฎ๐ซ๐๐ฅ & ๐๐๐ ๐ซ๐๐ ๐๐ญ๐ข๐จ๐ง ๐๐จ๐ซ๐ค๐ฌ
The project required the removal of existing escalators, lifts, and risers, followed by structural infills to achieve complete segregation between the ground and first floors. This enabled the upper level to be safely decommissioned and successfully handed back to the landlord.
๐&๐, ๐
๐ข๐ซ๐ ๐๐ง๐ ๐๐ข๐๐ ๐๐๐๐๐ญ๐ฒ ๐๐ฒ๐ฌ๐ญ๐๐ฆ๐ฌ
All mechanical, electrical, fire, and security systems were fully decommissioned, redesigned, adapted, and reinstated to meet current British Standards, client specifications, Building Control approvals, and centre management requirements.
Midway through the project, the decision was taken to significantly upgrade the M&E systems, extending the original 11-month programme to 18 months. This enhancement allowed for the installation of high-specification, energy-efficient systems, including:
โข LED lighting throughout
โข Refrigeration systems for food and drink
โข Air conditioning and ventilation
โข Fully integrated BMS and DALI control systems
โข New split-load and metered distribution and panel boards
โข Intelligent smoke extract system with UPS backup
โข Automatic fire detection, including VESDA (Very Early Smoke Detection Apparatus)
Fire-protected service routes were constructed from ground floor to roof level, alongside the installation of two new goods lifts and associated infrastructure.
๐๐๐ฅ๐๐ฌ ๐
๐ฅ๐จ๐จ๐ซ ๐๐ง๐ ๐
๐ซ๐จ๐ง๐ญ ๐จ๐ ๐๐จ๐ฎ๐ฌ๐
The sales area was comprehensively upgraded, including new fire doors, ceilings, wall finishes, wall fittings, fragrance cabinets, gondolas, pharmacy units, and beauty houses. Existing shopfittings were reconfigured and adapted to suit the revised store layout.
Front-of-house enhancements included:
โข New digital media screens at the shopfront, entrance, and within the beauty hall
โข Upgraded security cameras and intelligent EAS tagging system
โข Illuminated fret-cut signage
โข Redecoration throughout
โข Vertical air curtains
โข Deep clean and restoration of the existing terrazzo flooring
๐๐๐๐ค-๐จ๐-๐๐จ๐ฎ๐ฌ๐ ๐๐ฆ๐ฉ๐ซ๐จ๐ฏ๐๐ฆ๐๐ง๐ญ๐ฌ
The back-of-house areas also benefited from an expanded scope of works, including full redecoration and refurbishment of staff facilities. Upgrades included all toilet areas, corridors, and the staff canteen, with the addition of a new kitchen and a dedicated Click & Collect storage room.
๐๐ฎ๐ญ๐๐จ๐ฆ๐
Delivered within a live retail environment, this ambitious project transformed the store into a modern, streamlined single-floor destination. The result is an efficient, future-ready retail space that enhances both customer experience and operational performance, achieved through close collaboration with the client and stakeholders.
Completed - November 2025
Programme - 18 months

Prior to our possession, the landlord merged two small empty units, creating the footprint needed by the client. Taking ownership of the empty shell, WGS delivered a new concept-design store formed of 6 consulting rooms, 1 private consulting room, a pre-screen area, a contact lens teach area, and a generous sales floor area encompassing dispensing desks, breakfast bar dispensing area, illuminated frame bays, digital screens, wall art, and signage. The back-of-house area incorporates a large staff room, office, filing area, dedicated electrical cupboard, and DDA-compliant WC.
Our works included a full MEPH install, construction of all partition walls, ceilings, flooring (including screeding), fire protection works, joinery, shopfitting, furniture, signage, decorations, and ophthalmic equipment installation.
Future-proofing, part of our electrical works included the installation of new LED โDaliโ intelligent lighting, giving Boots the ability to monitor the storeโs lighting remotely (via Eon) - informing them when a light has failed, the ability to test the system, and alter lighting levels, controlled via a link to the lighting control panel (LCP) and Building Management System (BMS). In addition, Eon are also able to monitor the energy supply, which has an override protection, shutting down non-essential equipment to reduce the storeโs power consumption.
We employed specialist subcontractors to install a new VESDA (Very Early System Detection Activation) fire alarm system, smoke detectors, and fire alarm interfaces (installed on the HVAC to provide auto-shutdown on fire activation) - linked to the shopping centre for notification. The installations of a high-spec intruder alarm, sound system, and air scent diffuser system were also carried out by our specialist supply chain partners under our remit.
The scheme was made more challenging by incorporating a portion of the landlordโs structural works to strengthen the remaining shopfront within our programme. We also had to undertake the design and installation of a smoke curtain to maintain the shopping centreโs fire strategy and smoke-free escape route. With both causing inevitable delays to the schedule, our works had to be re-sequenced, with additional issues on the concept wall graphics and new BSA certification requirements slowing completion. Working collaboratively with the client team, specialist consultants, building control, and the landlordโs representatives, we were able to minimise programme disruption and complete the scheme within 16 weeks.

Commencement of the scheme saw us strip out the existing wiring, containment, and partial removal of the distribution board, as agreed with the landlord. Working closely with the principal contractor on the fit-out, we installed a new distribution board, new power and data to suit the proposed layout, electrical supplies for the air-conditioning units, and a disabled alarm system adjacent the Evac chair at the bottom of the staff area staircase for emergency use. Modern and sustainable LED lighting was also installed, reducing future maintenance needs to change lamps.
We employed a number of our specialist sub-contractors to install, test and commission a new fire alarm system, intruder alarm system, and a new PA sound system.
The project was delivered on time despite a 7-day delay due to the discovery of non-notifiable asbestos, with the site closed during its removal. With a collaborative working approach and an acceleration to the original programme, the scheme was completed in five weeks and the store opened on time.

External works comprised the installation of new shopfront fascia and signage, including a three-sided wrap-around digital screen to the entrance column.
Internally the existing ceramic floor was broken out and replaced. A new โOrder and Collectโ room was constructed, enhanced with vinyl graphics. A seven-meter steel framed, free-standing feature wall was built on the sales floor, enabling the self-service checkouts to be increased in number and relocated - fed by enhanced Cat5e network cabling. Fit-out works included the creation of a false effect sales floor ceiling void - painted black, new illuminated signage and installation of new low energy, intelligent Dali controlled lighting and emergency lighting - offering clean and ambient light levels, remote monitoring and testing, and lower ongoing running costs. The existing healthcare area underwent a โreinvigorationโ with new fixtures and fittings, with Boots own beauty brand, No.7 receiving new wall modules.
The scope also included a refresh to the back of house areas.
Collaboration with the client and the retail team was key to minimising disruption, with the store continuing to trade throughout the scheme. The fit-out was carried out behind hoarding over three phases, with temporary layouts to the sales floor maintaining the customer journey.

Handing over the empty unit to London City Airport, the store footprint was extended by their incumbent contractors over 5 weeks. Re-possession of the expanded shell saw us carry out a full fit-out over a 3-week period. The scheme comprised a new ceramic-tiled floor, installation of up-to-date sales floor fixtures and fittings, timber-effect wall treatments, feature graphic panel, signage, extended security shutter, and a modern suspended Rockfon acoustic baffled ceiling. Installation of new power data, lighting, wi-fi and CCTV system completed the internal fit-out.
Externally the unit received Novograf tile-effect cladding to the shopfront, skilfully installed around the curve of the unit, and finished with new illuminated signage.
In addition to the store, and located on a different level, a standalone office and separate stockroom were fitted out - complete with power and data, CCTV, and wi-fi links. The distances between these locations presented a particular challenge, requiring a specific design to ensure continuous functionality and compatibility.
Working closely with the airport team and incumbent contractors, we met milestone dates required to achieve the concept and detailed design sign-off in a cost-saving and timely manner.
The scheme was completed in 4 weeks.

External scope of work comprised installing a new shopfront fascia and new external entrance tiling. Internal works included reconfiguring the existing layout - installing a new sales floor ceiling, constructing new partition walls, installing specialist โEvolveโ wall fittings, frame bays, dispensing desks, new floor finishes, completing the scope of works with decorations throughout.
WGS Electrical attended installing new LED lighting, adapting and adding to the existing power and data, and managing the adaption of the existing intruder and fire alarms.
With local authority works to the pavements commencing directly outside the store unexpectedly, the programme was adapted and deliveries rearranged via a temporary route. Despite this, the scheme was delivered in under three weeks.

With the principal contractor taking ownership of an empty shell, we commenced our works by stripping out the existing electrical infrastructure (lighting, distribution boards, associated HVAC controls, and wiring). After installing a 10 KVA 110V site power system, we installed a temporary site lighting and power system.
Electrical fit-out works then comprised installing a new distribution board, including new split-sub metered Schneider boards - to meet our design calculations and proposed containment and wiring infrastructure. Designed to Building Regs Part L2A - sub-metering helps conserve power consumption in commercial buildings. The containment system incorporated trays and baskets for power, fire alarm, and data cabling, as well as a Busbar tap-off system for general power and lighting circuits.
Our scope also included brand new lighting, mainly consisting of track and spot LED lights with dimmable LED panel lights in the consulting rooms. All new LED emergency lighting systems were fitted with test facilities. New power supplies were installed for the HVAC system, along with a new wall-mounted comms cabinet, field wiring, and termination of Cat5E data cabling. A new fire alarm system was installed to strict L1 design specifications โ the highest level of life safety and protection.
Despite an initial 3-day delay to the programme due to lease complications, the store was delivered within the original 5-week programme.

๐๐๐จ๐ฉ๐ ๐จ๐ ๐๐จ๐ซ๐ค๐ฌ
We were responsible for the full electrical and fire alarm design and installation package, completed with guidance and review by Boots Group Engineering (BGE).
Working as subcontractors to Kiddie of Southport, we delivered the complete electrical infrastructure for the new opticianโs practice, including:
โข Temporary site power installation including a 10kVA transformer and site board
โข New split-load distribution system with integrated metering
โข Full LED lighting installation
โข Emergency lighting system compliant with BS 5266
โข Full L3 fire alarm system compliant with BS 5839
โข Data cabinet installation and structured LAN cabling
โข Communications cabling for:
o Digital media displays
o Wi-Fi systems
o Disabled refuge master station
โข DALI dimmable lighting controls within consultation rooms
โข Power supplies for:
o Electronic external shutters
o Heating, cooling and ventilation systems
o Illuminated external signage
โข Installation of illuminated frame display furniture with integrated LED lighting
The completed store included two ophthalmic consultation rooms, a pre-screen room, a retail sales floor with four dispensing desks, welfare facilities, office accommodation and DDA-compliant toilet facilities.
All electrical and fire alarm works were completed in accordance with BS 7671, BS 5266, BS 5839 and Boots internal specifications.
๐๐๐ฌ๐ข๐ ๐ง ๐๐ง๐ ๐๐๐ฅ๐ข๐ฏ๐๐ซ๐ฒ
The project involved integrating electrical, lighting, fire alarm and communications systems within a fast-track retail fit-out programme.
A key feature of the installation was the new split-load distribution system with integrated metering, supporting improved monitoring and energy management across the store.
The ophthalmic consultation rooms incorporated DALI dimmable lighting systems, enabling precise lighting control suited to clinical examinations and consultations.
๐๐ง๐ง๐จ๐ฏ๐๐ญ๐ข๐จ๐ง ๐๐ง๐ ๐๐ฎ๐ฌ๐ญ๐๐ข๐ง๐๐๐ฅ๐ ๐
๐๐๐ญ๐ฎ๐ซ๐๐ฌ
The project incorporated several energy-efficient and future-focused solutions, including:
โข Full LED lighting installation throughout
โข Intelligent DALI lighting controls
โข Metered split-load distribution boards
โข Digital media display integration
โข Infrastructure for low-energy HVAC systems
These elements contributed towards improved operational efficiency, reduced energy consumption and an enhanced customer environment.
๐๐ซ๐จ๐ ๐ซ๐๐ฆ๐ฆ๐ ๐๐ง๐ ๐๐๐ฅ๐ข๐ฏ๐๐ซ๐ฒ ๐๐ฎ๐ญ๐๐จ๐ฆ๐
All electrical and fire alarm installations were completed within the five-week programme and handed over successfully in line with the clientโs operational requirements.
๐๐ฅ๐ข๐๐ง๐ญ ๐
๐๐๐๐๐๐๐ค
Neil Young, Property Project Manager for Boots Opticians, commented:
โ๐โ๐๐๐๐ฃ๐๐ ๐ผ ๐๐ ๐๐๐ ๐ฆ๐๐ข ๐๐๐ ๐ ๐ข๐๐๐๐๐ก, ๐ฆ๐๐ข ๐ค๐๐๐ 100% ๐๐ ๐กโ๐ ๐๐๐ ๐.โ

๐๐๐จ๐ฉ๐ ๐จ๐ ๐๐จ๐ซ๐ค๐ฌ
Following licensed asbestos removal, WGS Electrical completed the full electrical installation, including a new distribution board with sub-metered Schneider boards, busbar tap-off system, LED lighting throughout, emergency lighting, power supplies for the HVAC installation, structured cabling, communications cabinet and a new fire alarm system. The installation supported the complete fit-out of the new opticians and hearing care facility.
๐๐๐ฒ ๐
๐๐๐ญ๐ฎ๐ซ๐๐ฌ
โข Complete electrical installation for the relocation of a Boots Opticians store.
โข Energy-efficient LED lighting and emergency lighting throughout.
โข New sub-metered electrical distribution system to support energy monitoring.
โข Power and infrastructure for HVAC, communications and hearing care facilities.
โข Installation of a high-specification fire alarm system.
๐๐ซ๐จ๐ ๐ซ๐๐ฆ๐ฆ๐
The electrical installation was delivered over a four-week programme, with works carefully coordinated alongside the wider fit-out activities to support the successful relocation of the store.
๐๐ฎ๐ญ๐๐จ๐ฆ๐
The project was completed snag-free, on time and to budget, providing Boots Opticians with a modern, energy-efficient electrical installation to support an enhanced clinical and retail environment.
Completed: May 2025
Programme: 5 weeks
Office Fit-outs

๐๐๐จ๐ฉ๐ ๐จ๐ ๐๐จ๐ซ๐ค๐ฌ
The project comprised the complete strip-out of the existing office accommodation, removal of redundant mechanical and electrical services and rooftop plant, construction of a new floor infill and delivery of a comprehensive CAT B fit-out.
Works included the installation of new glazed office partitions, internal doors, acoustic ceilings and wall systems, open-plan office areas, a boardroom, meeting rooms, bespoke joinery items, a new kitchen, print room, locker facilities, new male, female and accessible toilet facilities, a dedicated shower room, a new reception area, replacement passenger lift and external balcony works. A complete mechanical and electrical installation was delivered, including power, lighting, data, Wi-Fi, heating, ventilation, cooling, fire alarm, sprinkler and access control systems. The project was completed with full internal decoration, installation of new furniture throughout the office and meeting spaces, together with testing, commissioning and client training prior to handover.
๐๐๐ฒ ๐
๐๐๐ญ๐ฎ๐ซ๐๐ฌ
โข Complete CAT B office fit-out within a live, occupied multi-use building.
โข High-specification corporate office environment with integrated AV and IT infrastructure.
โข Bespoke joinery and feature architectural finishes throughout.
โข Replacement passenger lift serving six floors within the existing lift shaft.
โข Roof plant replacement requiring crane operations and coordinated road closures on Oxford Street.
โข Full testing, commissioning and client training prior to handover.
๐๐ก๐๐ฅ๐ฅ๐๐ง๐ ๐๐ฌ
Delivering the works within a constrained city-centre location required meticulous logistics planning. With no provision for skips, material storage or the use of lifts for construction activities, all materials and demolition waste were manually transferred via stair access and coordinated with scheduled vehicle movements on one of Londonโs busiest pedestrian routes.
Maintaining business continuity throughout the programme was critical. Retail operations on the ground and first floors remained fully operational, while corporate staff were temporarily relocated to the third floor for the duration of the refurbishment. Close collaboration with Boots UK and the wider project team ensured construction activities were carefully planned to minimise disruption to day-to-day operations.
๐๐ซ๐จ๐ ๐ซ๐๐ฆ๐ฆ๐
The refurbishment and CAT B fit-out were successfully delivered over a 20-week programme. Detailed planning, proactive stakeholder engagement and careful sequencing of works enabled WGS to coordinate specialist installations, crane operations, commissioning activities and phased access while maintaining programme certainty.
๐๐ฎ๐ญ๐๐จ๐ฆ๐
The completed refurbishment provides Boots UK with a modern, high-quality corporate office environment incorporating upgraded meeting facilities, improved welfare amenities, contemporary collaborative workspaces and enhanced building services. The project was completed safely and successfully, receiving excellent feedback from Boots UKโs corporate staff on the quality of the finished workspace and the overall standard of delivery.
๐๐จ๐ฆ๐ฉ๐ฅ๐๐ญ๐๐: June 2026
๐๐ซ๐จ๐ ๐ซ๐๐ฆ๐ฆ๐: 20 weeks

Autex Symphony soundproofing boards were installed on timber-battened walls to achieve both acoustic properties and offer an aesthetically pleasing, textured finish. The ceiling also received Autex Cube acoustic baffles, with linear lighting located to suit the baffle locations and modern feature lighting above the meeting desks โ all energy efficient, with controllable dimmable options.
We stripped out the existing cork-board wall treatment and created a new pin-up area with Autex Symphony boards to match, low level cupboards, feature strip lighting and a large LED screen.
New planter window boxes were hung from Unistrut across the width of the office, with plants hiding the mechanical infrastructure towards the rear of the office. The scheme was finished with the walls and ceilings redecorated to the clientโs specification.
The completed scheme was delivered on time and to a value-engineered budget, still maintaining the look the client required. Working in a live environment throughout the programme (including dealing with the landlordโs interface on the life safety systems), the project was delivered to high praise of the practice associates.
Healthcare

๐๐๐จ๐ฉ๐ ๐จ๐ ๐๐จ๐ซ๐ค๐ฌ
The project comprised the complete demolition and strip-out of the existing Hearingcare facility back to shell, followed by the construction and fit-out of a new hearing care environment in accordance with the latest Boots World of Hearing design standards.
Works included new consultation rooms, a dedicated experience room, reception and waiting areas, branded customer Journey and Impress Walls, together with all associated finishes and specialist fit-out elements. WGS also delivered the complete electrical design and installation, including DALI lighting controls, BMS-integrated power controls, fire alarm systems, CAT5e infrastructure, communications cabinet and new power and data installations.
In addition, former retail space on the second floor was repurposed to create new back-of-house accommodation for the wider Boots UK store, including offices, welfare facilities, a staff canteen, faith room, and male, female and accessible toilet facilities, all constructed and finished to the latest Boots UK specification.
๐๐๐ฒ ๐
๐๐๐ญ๐ฎ๐ซ๐๐ฌ
Complete shell-to-CAT B fit-out of a new Boots World of Hearing facility.
Full electrical design and installation package.
DALI lighting controls integrated with the Building Management System.
Specialist branded customer experience areas, including Journey and Impress Walls.
Creation of new staff welfare and operational facilities for the wider Boots UK store.
Delivered as part of an ongoing multi-phase refurbishment programme.
๐๐ก๐๐ฅ๐ฅ๐๐ง๐ ๐๐ฌ
The works were undertaken within a live operational building, requiring careful planning to protect retail operations on the floors below while maintaining corporate office functions above. Construction activities were carefully sequenced to minimise disruption, with strict controls around access, noise and working practices.
Labour demands fluctuated significantly throughout the programme, with workforce levels exceeding 20 operatives during key phases. Flexible resource planning, including a combination of daytime working and targeted night shifts, enabled WGS to maintain programme milestones while safely coordinating multiple trades within a constrained environment.
๐๐ซ๐จ๐ ๐ซ๐๐ฆ๐ฆ๐
The project was delivered over a phased 13-week programme. Close collaboration with Boots UK, the design team and supply chain partners, together with proactive planning and effective coordination, ensured the works progressed efficiently while maintaining business continuity throughout.
๐๐ฎ๐ญ๐๐จ๐ฆ๐
The completed project provides Boots UK with a modern, customer-focused hearing care facility designed to the latest World of Hearing standards, alongside upgraded back-of-house accommodation that enhances staff welfare and operational efficiency. Successfully delivered within a live environment, the project formed another key milestone in the ongoing transformation of the Sedley Place headquarters and received positive feedback from the client team.
๐๐จ๐ฆ๐ฉ๐ฅ๐๐ญ๐๐: May 2026
๐๐ซ๐จ๐ ๐ซ๐๐ฆ๐ฆ๐: 13 weeks

The shell and core unit underwent a huge transformation and comprised the installation of mains water, mechanical and electrical services. New split-level ceilings (housing the services), high-spec flooring, and modern wall claddings adorning the internal envelope of the store.
With the unit located above the basement car park, strengthening works to the floor structure were carried out in readiness for the delivery of an automated pharmacy robot. The high-spec digital dispensing machine now offers modern medication management and is a big plus for both the store and the hospital.
The sales area comprised new healthcare counters and backwall, a seated waiting area, consultation room, food chillers, gondola, and click-and-collect lockers. New to Boots, these lockers will allow the patient to download an app and collect prescriptions without the need to queue.
The schemed was completed with full internal decorations, sales floor signage, new shopfront fascia and window vinyl graphics.
Duration: 6 weeks

The existing pharmacy had outgrown the demand for scripts and needed to increase its operational capacity. With the customer wait time top priority, the Boots team, along with our in-house architectural team agreed the scope to expand the footprint, add additional terminals (to cut down on queue times), and fit out the entire area to the latest Boots specifications.
Work also included temporarily relocating the existing dispensary to an old photo lab area (including necessary power and data). The store continued dispensing from this area for two weeks until their new home was ready.
The completed scheme was received with great feedback from the store manager who happily reported the customer wait times had been greatly reduced. Boots Project Planner Wayne Dibben also offered high praise, saying โ Itโs one of the best dispensary transformations Iโve seen in over 30 years with Boots.โ

With the emphasis being on aesthetics, wellbeing, and mindfulness, the completed scheme offered a beautiful wet room - worthy of each child needing its facility.
With the hospice set in picturesque meadowland, it offers specialist care and support for babies, children, and young people living with complex or incurable conditions. Itโs always a humbling experience working within such a positive environment, and we are super proud to have helped deliver this scheme.
Hospitality & Leisure

๐๐๐ฒ ๐๐ก๐๐ฅ๐ฅ๐๐ง๐ ๐๐ฌ
โข Delivering a full refurbishment within a tight six-week programme
โข Carrying out works in a live trading environment
โข Minimising disruption to customers by programming works Monday to Thursday
โข Coordinating structural and AV installations within an existing building
๐๐๐๐๐ ๐๐ ๐๐๐๐
๐๐ญ๐ซ๐ข๐ฉ-๐๐ฎ๐ญ ๐๐ง๐ ๐๐๐ฆ๐จ๐ฅ๐ข๐ญ๐ข๐จ๐ง
โข Removal of the existing entrance lobby, including ceilings, bulkheads, flooring, and counters
โข Strip-out of walls, ceilings, bulkheads, flooring, and servery equipment across the main hall, WCs, and book sales area
๐๐๐ฐ ๐๐ง๐ญ๐ซ๐๐ง๐๐ ๐๐ง๐ ๐๐ฎ๐ฌ๐ญ๐จ๐ฆ๐๐ซ ๐๐ซ๐๐๐ฌ
โข Formation of a new, smaller entrance lobby
โข Installation of new glazed screens and doors
โข New bulkhead construction, entrance matting, and carpeting
โข Extension of the book sales counter to provide DDA-compliant access
โข New stud wall behind the counter to achieve a flush, high-quality finish
๐๐๐ข๐ง ๐๐๐ฅ๐ฅ ๐๐ง๐ ๐๐๐ซ ๐๐จ๐ซ๐ค๐ฌ
โข Construction of a large load-bearing timber stud wall across the stage to house a 20m AV screen, built to the structural engineerโs specification
โข New partition wall formed in the former servery area to create on-trend booth seating
โข Bar upgrades including new laminate counter finishes, additional plumbing supplies, and high-level glass racking
๐
๐ข๐ง๐ข๐ฌ๐ก๐๐ฌ ๐๐ก๐ซ๐จ๐ฎ๐ ๐ก๐จ๐ฎ๐ญ
โข Installation of new carpet, entrance matting, wood-effect laminate, and vinyl flooring across the premises
๐๐ฎ๐ญ๐๐จ๐ฆ๐
Completed in just six weeks, this highly successful refurbishment was delivered within a live trading environment, with works carefully programmed to avoid disruption. The result is a refreshed, contemporary venue that enhances the customer experience and has been extremely well received by the client.
Completed - July 2025
Programme - 6 weeks

The gas supply was capped off and the pipework removed. The existing plumbing and services were replaced, with alterations to the waste to suit the proposed layout. Internal walls were demolished and new walls constructed, including doors, window beds and boxings โ all left prepped and ready to receive decoration. The floors were made good before receiving new vinyl to the staff areas, carpet to the customer areas and barrier matting to the entrance lobby.
The newly formed bar area was fitted out with new unitary supplied by the client. Back of house saw a new ceiling grid and tiles installed, along with new fixtures and fittings to the office.
All works were completed in 6 weeks.

The building had lain dormant for many years and has now undergone extensive renovation work to change its use to staff accommodation.
Works included the removal of the existing roof, windows, and doors, a complete internal strip out of the fixtures, fittings, plumbing, and electrical installations, alongside the licensed removal of asbestos-containing floor coverings and fireplaces.
Structural repairs were carried out to the roof, floor joists, and the single-story extensions on either side of the original gatehouse - all under guidance of the structural engineer.
The building was treated for dry rot, woodworm, and an insect infestation. During the process of the strip out, two bat colonies were discovered - associated works were carried out under the control of an ecologist.
New lead flashings and four newly formed dormers were installed in the roof, which in turn was re-tiled, with a the majority being salvaged from the existing roof. We overhauled the existing Klargester septic tank, carrying out drainage repairs, installing a new water main, cast iron guttering and downpipes. The lime render was repointed, and the installation of new lead-light windows and doors completed the external works to the property.
Internal works comprised the installation of a new damp course, lime-plastered ceilings (in keeping with Heritage regulations), a complete electrical re-wire, and new plumbing - three bathroom suites, two combi boilers, and radiators. Two new kitchens were fitted with new flooring throughout. The existing internal doors were retained and refurbished, with exterior and interior decorations finishing the project.
Scheme duration: 15 weeks
Heritage

๐๐๐จ๐ฉ๐ ๐จ๐ ๐๐จ๐ซ๐ค๐ฌ
The project involved the partial demolition, repair, and reconstruction of approximately 90mยฒ of historic walling.
Key works included:
โข Partial demolition of structurally unsafe sections where repair was not viable
โข Raking out and replacement of defective mortar joints
โข Removal of approximately four tonnes of waste material from site
โข Salvage and reuse of suitable original Stamford stone
โข Sourcing and installation of matching stone from a local supplier
โข Installation of a new French drain system to improve long-term drainage performance
โข Construction of a small patio area for the Stamford Trustees following project completion
๐๐จ๐ง๐ฌ๐๐ซ๐ฏ๐๐ญ๐ข๐จ๐ง ๐๐จ๐ง๐ฌ๐ข๐๐๐ซ๐๐ญ๐ข๐จ๐ง๐ฌ
The site is located within Stamfordโs designated conservation area; the first urban conservation area established in England in 1967. Due to the archaeological sensitivity of the location, excavation depths were restricted to a maximum of 12 inches to minimise the risk of disturbing potential historic features. As no predefined mortar specification existed for the wall, a series of trial mixes were produced and reviewed in collaboration with all stakeholders. Once approved, the final mortar mix was documented to ensure consistency for any future maintenance or repair works. While every effort was made to salvage and reuse the original Stamford stone, much of the existing material had deteriorated beyond practical reuse. To maintain the historic character of the wall, matching stone was carefully sourced from a local supplier, enabling a sympathetic restoration that blended seamlessly with the retained structure.
๐๐ซ๐๐ข๐ง๐๐ ๐ ๐๐ฌ๐ฌ๐ฎ๐๐ฌ
The yard area had historically suffered from flooding during periods of heavy rainfall. To address this, WGS installed a French drain system designed to improve water management and protect the rebuilt wall from future moisture-related deterioration.
๐๐ญ๐๐ค๐๐ก๐จ๐ฅ๐๐๐ซ ๐๐จ๐จ๐ซ๐๐ข๐ง๐๐ญ๐ข๐จ๐ง
As the wall sat between listed buildings and adjacent land owned by the Stamford Trustees, ongoing liaison with both the Trustees and the local authority was essential throughout the works to ensure compliance and minimise disruption. Working on behalf of Boots also presented a significant logistical challenge, as the only alternative access route to the site was directly through the live trading store. To avoid disruption to daily operations, the Stamford Trustees kindly granted us access across their adjoining land for the duration of the programme. In appreciation of their cooperation and support throughout the project, WGS supplied and installed a small patio area within the Trusteesโ grounds for future use and enjoyment.
๐๐ฎ๐ญ๐๐จ๐ฆ๐
The completed works successfully restored the structural integrity and visual appearance of the historic wall while preserving the character of the surrounding conservation area. Through careful material selection, considered conservation practices, and collaborative stakeholder management, WGS delivered a durable and sympathetic restoration designed to safeguard the structure for years to come.